After the aluminum ash ball mill has been installed, it needs to be run in first. Run-in period is very important for the equipment, it plays a great role in the future production operations, can reduce the occurrence of equipment failure to a certain extent, thus effectively improve the use of equipment time. Therefore, the responsible personnel should seriously carry out the necessary running-in and maintenance of the equipment, in strict accordance with the requirements of the use of equipment to operate, to strictly require their own so as to reduce production problems. So in the use of aluminum ball mill before we pay attention to what?

1.No-load operation shall be carried out before trial operation, and the continuous running time shall be 12-24 hours. Problems during working hours should be resolved in a timely manner;

cone crusher

2. The cooling and smoothing system should be normal before trial operation. Before the precision of the gear tooth surface can not meet the requirement, the final judgment should be made according to the external environment of the size gears and the reducer gears. All qualified parts and equipment must be qualified before the next operation; 

3, in the test work, the work of the system should be normal. The temperature of all parts shall be within the specified range and the parameters of all instruments shall conform to the requirements. When two-thirds of the grinding body of the aluminum ash ball mill is loaded, check the fastener after two days of work. If they are loose, tighten them; 

4, aluminum ball mill equipment for no-load work. In the future, do not carry out full load operation in the production process. When the equipment in the production process, should be phased. In the process of work, should be based on the increase or decrease of material, in order to avoid the abrasive body and liner caused unnecessary wear and damage.